Tag: the one

  • Cervino The One: Everything You Need to Know About Cervinia’s New 3S Lift

    Cervino The One: Everything You Need to Know About Cervinia’s New 3S Lift

    Breuil-Cervinia has always been one of the most iconic ski destinations in the Alps. From its first cable car built back in 1936 to today’s world-class ski area connected with Zermatt, the resort has constantly evolved while preserving its unique alpine character.

    Now, Cervinia is preparing for its most ambitious project ever.

    Introducing Cervino The One: a brand-new 3S ropeway that will completely transform the way visitors travel from Breuil-Cervinia to Plateau Rosa. Scheduled to open in December 2029, this €200 million investment is set to become one of the most advanced lift systems in Europe.

    As a local ski instructor, I genuinely believe this project will mark the beginning of a new era for Cervinia.

    Cervino the one

    What Is Cervino The One?

    “Cervino The One” is the name of the future 3S cable car that will replace the current lift system connecting Breuil-Cervinia with Plateau Rosa.

    The name isn’t just a marketing choice.

    It also stands for Our New Elevation, reflecting Cervino Ski Paradise’s vision of taking the resort to an entirely new level in terms of technology, comfort and year-round tourism.

    Unlike traditional gondolas, a 3S (Three-Rope System) combines two fixed carrying cables with one hauling rope.

    This technology offers several major advantages:

    • exceptional stability
    • outstanding wind resistance
    • higher transport capacity
    • smoother ride
    • fewer support towers
    • increased passenger comfort

    It’s the same technology used in some of the world’s most prestigious mountain destinations.

    Cervino the one

    Two Ropeways, One Seamless Journey

    Although many people simply refer to it as one lift, Cervino The One will actually consist of two interconnected ropeways.

    The first section will connect:

    Breuil-Cervinia → Plan Maison

    The second section will continue from:

    Plan Maison → Plateau Rosa

    Passengers will remain within one integrated transport system, making the journey quicker and much more comfortable than today.

    Cervino the one

    Record-Breaking Numbers

    The scale of the project is truly impressive.

    Here are some of the key figures:

    FeatureDetails
    Total lengthAround 6 km
    First section1,850 metres
    Second sectionOver 4,000 metres
    Vertical riseNearly 1,500 metres
    Operating speed8 m/s (29 km/h)
    Capacity3,000 passengers per hour
    Travel timeLess than 17 minutes
    Opening targetDecember 2029

    For visitors, this means less waiting, faster access to high-altitude skiing and a much smoother experience throughout the day.

    Cervino the one

    From Cervinia to Plateau Rosa in Less Than 17 Minutes

    One of the most exciting improvements will be the dramatic reduction in travel time.

    Today’s journey involves multiple lifts and can take considerably longer depending on queues and weather.

    With Cervino The One, passengers will reach:

    • Plan Maison in approximately 4½ minutes
    • Plateau Rosa in around 12 additional minutes

    The total journey will take less than 17 minutes.

    For skiers, snowboarders and sightseers alike, this will make accessing the glacier faster than ever before.

    Built for High-Altitude Conditions

    Operating above 3,400 metres, this project faces unique engineering challenges.

    Extreme weather, heavy snowfall, strong winds and difficult logistics all need to be taken into account.

    That’s precisely why Cervino Ski Paradise chose a 3S system.

    Compared with conventional gondolas, 3S technology offers exceptional stability even during strong winds, helping reduce weather-related interruptions and increasing reliability throughout the winter season.

    For a resort like Cervinia, where wind can sometimes affect lift operations, this represents a significant improvement.

    Cervino the one

    Designed by Industry Leaders

    The construction has been entrusted to a consortium led by Leitner, one of the world’s leading ropeway manufacturers.

    Several experienced local companies will also contribute to the civil engineering works.

    The project isn’t only about engineering.

    It’s also about design.

    The panoramic cabins have been created in collaboration with Pininfarina Architecture, promising a premium travel experience with elegant interiors and spectacular views of the Matterhorn.

    The stations have been designed by the architectural studio Policreo, combining modern aesthetics with functionality.

    The goal is to create a lift that becomes an attraction in itself.

    Sustainability at the Heart of the Project

    One of the most interesting aspects of Cervino The One is its strong environmental focus.

    The lift will operate using electricity generated from renewable energy sources supplied by CVA.

    Additional sustainable technologies will include:

    • photovoltaic panels on every station
    • geothermal heating at Plan Maison
    • heat pumps throughout the system
    • energy-efficient operating solutions

    The aim is to reduce environmental impact while maintaining high performance throughout the year.

    Cervino the one

    More Than a Ski Lift

    Although skiers will certainly benefit the most, Cervino The One is designed for much more than winter sports.

    Thanks to its panoramic cabins and comfortable ride, the lift will also attract:

    • hikers
    • mountain bikers
    • photographers
    • families
    • international tourists
    • visitors simply wishing to experience the spectacular views of the Matterhorn

    Perhaps the biggest change is that it will become possible to reach the high mountain environment even without skiing.

    This supports Cervinia’s ambition of becoming a genuine 365-day mountain destination, rather than being known only as a winter resort.

    Cervino the one

    A €200 Million Investment in the Future

    With a total investment approaching €200 million, Cervino The One represents one of the largest infrastructure projects ever undertaken in the Italian Alps.

    Approximately €70 million will be funded by the Autonomous Region of Aosta Valley, while the remaining investment will be financed by Cervino S.p.A.

    Preparatory works have already begun, with major construction expected to progress over the coming years as final authorisations are completed on both the Italian and Swiss sides.

    If everything proceeds according to schedule, the first passengers will board the new lift in December 2029.

    Cervino the one

    Why This Matters for Skiers

    As someone who spends every winter teaching in Cervinia, I see this project as much more than simply replacing an old lift.

    It represents a completely different experience.

    Less time travelling.

    Less waiting.

    More comfort.

    Greater reliability.

    More time enjoying the slopes.

    For families, beginners and experienced skiers alike, faster access to the upper ski area means making the most of every ski day.

    And for international visitors, it further strengthens Cervinia’s position as one of Europe’s premier alpine destinations.

    Looking Ahead

    The history of Cervinia has always been closely linked to innovation.

    From the first cable cars in the 1930s to today’s connection with Zermatt, every generation has transformed the resort while respecting the spectacular mountain that surrounds it.

    Cervino The One is simply the next chapter.

    When it opens, it won’t just be one of the most technologically advanced lifts in Europe—it will become a new symbol of Cervinia itself.

    As a ski instructor who calls these mountains home, I can’t wait to experience that first ride.

    If you’re planning your ski trip and want help choosing where to eat, ski, or stay, don’t hesitate to reach out — you can email me anytime at info@skiwithriky.com. I’ve personally eaten at all these spots, skied these slopes for many winters, and I’d be happy to help you plan your perfect food-and-ski adventure in Cervinia.

    See you on the slopes,

    Riky

  • Cervino The One Ski Lift: A Leap Into the Future of Cervinia

    Cervino The One Ski Lift: A Leap Into the Future of Cervinia

    Cervinia is preparing for a revolution in Alpine skiing with the launch of Cervino The One ski lift. Announced on August 22, this ambitious €200 million project will reshape the way skiers and visitors experience the Alps. The state-of-the-art 3S gondola will link Breuil-Cervinia to Plateau Rosa in only 17 minutes, cutting travel time by more than half compared to today’s 50 minutes.

    Construction is expected to begin in spring 2026 and finish in 2030. Once completed, this futuristic lift will combine the efficiency of a cable car with the comfort of a gondola, featuring long spans, steep gradients, and cabins capable of carrying 30 passengers. The line will stretch for nearly six kilometers, with a total elevation gain of 1,427 meters.

    Capacity, Speed, and Comfort

    Cervino The One ski lift has been designed with record-breaking performance in mind. With an hourly capacity of 3,000 passengers, wind stability up to 100 km/h, and speeds reaching 8 meters per second (around 29 km/h), it promises smooth and reliable transport even in challenging conditions.

    The 56 Symphony model cabins will feature 360-degree panoramic windows, heated leather-style seating for 24 people, internal ski racks, anti-slip flooring, multimedia screens, and advanced communication systems. Everything has been planned to maximize comfort and safety for skiers traveling to the Plateau Rosa at 3,458 meters.

    A Sustainable and Secure Future

    Sustainability is a cornerstone of the Cervino The One ski lift project. Thanks to DirectDrive motors, which run at just 33 rotations per minute, energy consumption will be reduced, while noise emissions will stay below 85 decibels — remarkable for an installation of this size.

    On the safety side, the lift will include four independent drive systems (main, reserve, recovery, and emergency) as well as three braking systems, ensuring minimal risk of stoppages even during power outages.

    Stations and Infrastructure

    The new lift will not only transform the ride but also the stations themselves. The base station at 2,031 meters will become a modern hub with ticket offices, rental services, shops, bars, and restaurants. The mid-station at Plan Maison (2,550 meters) will integrate with existing lifts and include restaurants, commercial areas, and even an underground automated warehouse for cabins and equipment.

    At the top, the Plateau Rosa station (3,458 meters) will be carved into the rock, directly connecting with Switzerland’s Klein Matterhorn facilities, completed in 2023.

    Architecturally, the project will blend stone, reinforced concrete, glass, and wood for a sleek yet natural finish, with zinc-titanium roofing and photovoltaic panels to generate clean energy.

    The Investment Behind Cervino The One

    The Cervino The One ski lift is backed by an investment of approximately €200 million. The Autonomous Region of Valle d’Aosta has already allocated €70 million, while Cervino Spa will cover the rest through self-financing, bank loans, and recent strong financial performance.

    Construction will be led by Leitner, a leader in ropeway technology, alongside a consortium of local companies handling civil works.

    Why It Matters for Skiers and Visitors

    By 2030, Cervinia will no longer just be a top ski destination — it will become a symbol of modern Alpine tourism. The Cervino The One ski lift will drastically improve accessibility, enhance comfort, and provide a sustainable model for future mountain transport.

    For skiers, this means less time commuting and more time on the slopes. For visitors, it represents an easier and more enjoyable way to discover the beauty of the Alps.

    Final Thoughts

    The unveiling of Cervino The One ski lift is more than just the announcement of new infrastructure. It’s a bold vision of the future, blending innovation, sustainability, and Alpine tradition. By 2030, Cervinia will stand at the forefront of world-class mountain resorts, ready to welcome thousands of visitors in a faster, safer, and more comfortable way.

    Where tradition meets innovation, the future of Alpine skiing has a new name: Cervino The One.

    See you on the slopes,

    Riky